New funicular station on the Mont Blanc massif

Project: A new funicular railway connecting Pontal d’Entrèves with the Refuge Torino nearby the peak of Punta Helbronner.

Area: Mont Blanc – Courmayeur

Ordering party: Funivie Monte Bianco S.p.A.

Designed by: Dimensione Ingegnerie s.r.l.

Company: Cordée Mont Blanc

Realisation dates: April 2011 – May 2015

RDEI solutions applied: 1 Grease Trap – 1 Imhoff Tank -1 Anaerobic Percolating Filter

System for civil wastewater treatment intended for 92 users, complete with special solutions for installation at height and automatic sludge removal.

Advantages:

  • Made of polyethylene: light, easy to transport and handle.
  • Ad hoc study carried out by the ISEA – REDI team
  • REDI assistance during the installation

System’s characteristics:
Water treatment system designed for nearly 92 users, in conformity with the standards indicated in Italian legislation, complete with special solutions for installation at height and automatic sludge removal. Composed of a Primary Settling Chamber (Imhoff 1000 NON STANDARD ISEA – about 100 users/day) for sewage pre-treatment, a Grease Trap for grey water treatment (FAMILY 4000 ISEA – closely 600 users/day) and an Anaerobic Percolating filter (model 10000 ISEA) suitable for treatment of civil wastewaters to enable the convey to a suitable final destination.